Eze Castle Integration

ECI specialise in Hedge fund technology, hedge fund cloud services provider, private equity cloud and outsourcing support.

MPE Group were employed by the main contractor Mayron to assist in the M&E installation of the newly acquired ECI Head offices in St.Thomas Street, London Bridge.
The existing office layout was not typical of most.

Floors were of solid concrete so to provide power to the desks, power poles were sourced and installed.
Basket tray for both Data and electrical cable containment was installed above the false ceiling serving a number of power poles to and partitioned offices.

Along with the M&E design MPE were responsible for the Data installation, Air Conditioning installation to the newly formed COMMS room, CCTV installation and the electrical installation.